Phone: 0207 965 7355

Email : info@thenovacrowd.co.uk

welcome to The Nova Crowd

Investment portfolio builders

Build to let specialists

About Us

welcome to The Nova Crowd

Investment property developers

Development project self-funders

Contact Us

about The Nova Crowd

light logo

Property developers with a difference

Many savers have been hit by the low interest rates and as a result have surplus funds in their current or deposit accounts with limited options to increase their annual returns. If you want to see your money working smarter for you but not sure how, then give us a call.

Development Portfolio

See our portfolio of live and completed developments.

property image

Sold

Earl Shilton

???,??? (GBP)

More Details
property image

Reserved

Barwell I

2,250,000.00 (GBP)

More Details
property image

Available

Barwell II

2,000,000.00 (GBP)

More Details

If you want to know more!

call us on : 0207 965 7355

Available properties

Receive our list of properties that are currently available

Our Services

The Nova Crowd offer project management, project finance and portfolio development services.

Property Development

Our skilled project management team are ready to deliver any development.

Development Finance

We finance projects that fit our criteria as well as help to define and implement a suitable financing approach for projects that we don’t finance ourselves.

Joint Ventures

The Nova Crowd will consider all opportunities on a without prejudice basis.

Investment Opportunities

The Nova Crowd are always looking for opportunities to add value.

News

Meters have arrived

10/11/2020: Earl Shilton Eon have been to install our meters. Ready for when tenants move in. Finishing touche

Road closure

07/11/2020: Earl Shilton Severn Trent Water have put the signs up to close the road so we can get water to the

More windows

04/11/2020: Barwell The top two floors now have their windows in. All measured up and ready for the ground flo

Windows going in

22/09/2020: Barwell Middle floor windows starting to go in and looking fantastic. The size of them really give

Block work

17/09/2020: Barwell Block work on the outside near completed so we can start to measure the windows and get th

Scoffolding down

28/08/2020: Earl Shilton We have taken the scaffolding down from the front of Earl Shilton ready for Western P

Kitchens fitted

01/08/2020: Earl Shilton Kitchens fitted with the floors done ready for the second fixing once we get the elec

Planning Notices Up

03/06/2020: Barwell Planning notice is up for phase 2 of our Barwell project for 14 new build apartments. Woul

Painting

07/07/2020: Earl Shilton The outside has now been painted. Really brightens up the exterior and gives it that

Safety First

01/07/2020: Barwell Getting the site ready for the existing windows to be removed ready for the new ones to be

Clean up continues

30/06/2020: Barwell Good view from the 2nd floor of the diggers getting rid of the mass of debris from the sit

Kitchens have arrived

21/06/2020: Earl Shilton No rest for the builders over the weekend fitting the kitchens in the 6 apartments. A

Rendering complete

08/06/2020: Earl Shilton Plasterer finished the external rendering. Looks so much cleaner and now looks in kee

Scaffolding up and looking imposing

05/06/2020: Barwell Scaffolding fully up at Barwell now so we can prepare for the windows. Also makes it easie

Large block delivery

04/06/2020: Barwell Thousands of blocks unloaded onto site ready to finish the internal walls. Once these are

Clean up

27/05/2020: Barwell Diggers have arrived on site to get rid off the rubbish removed from the building. As it i

Internal doors fitted

20/05/2020: Earl Shilton Internal doors and skirting boards now in place in the flats. All in place which now

Scaffolding returns

13/05/2020: Earl Shilton Scaffolding is back up ready to do the rendering on the outside of the building. Fina

Painting completed

20/03/2020: Earl Shilton Painting completed in the flats, amazing how a white gloss can bring out the space. K

Velux fitted

01/03/2020: Earl Shilton Final velux window fitted in the stairwell. Ready for the final bits of plastering be

Drains been dugout

21/02/2020: Barwell Trenches have been dug on the ground floor. All been signed off by the building inspector

Had enough of this wind

10/02/2020: Barwell Time to block up the biggest hole in the building on the 3rd floor. The wind is blowing a

Blocks Blocks Blocks

31/01/2020: Barwell The lads are working hard to lay the blocks. Ground floor up to ceiling height and service

Back with a vengeance

21/01/2020: Barwell Glad to have had the winter break and get everything in order, back with a vengeance and s

Clean up

26/09/2019: Barwell Cleaning up the car park where all the internally rubbish was pushed. Starting to move on

Blocks delivered

18/09/2019: Barwell Blocks have been delivered ready to start the internal walls. This will allow us to get th

Boards looking good

12/09/2019: Barwell We are happy with our boards that have been delivered today. Shows the locals what we are

Doors windows and felt

15/08/2019: Earl Shilton We have a watertight building as the windows and doors have now been fitted. Lath and

All clean

02/08/2019: Barwell Quite a lot of tonnes of rubbish now out of the building and we are ready to start work on

What a difference

07/07/2019: Barwell What a difference 2 days makes. Really starting to feeling the sense of space once it has

New acquisition for the Nova Group

05/07/2019: Barwell Planning permission has been granted to convert this office block into 15 apartments. 12 2

Dormer windows taking shape

28/06/2019: Earl Shilton Windows have now taken shape and starting to look like the finished property. Looking

Roof starting to take shape

26/06/2019: Earl Shilton Roofers working hard to make the building water tight so we can start on the internal

Back on site

25/05/2019: Earl Shilton Difficult winter with the weather so no builders on site. So glad to be back up and r

Roof joists have arrived

17/06/2019: Earl Shilton 3rd floor blocks being put down. Roof steels in place. Scaffold ready for 3rd lift as

3rd Floor Underway

19/12/18: Earl Shilton 3rd floor blocks being put down. More scaffolding required as we prepare for the roof j

Upto Second Floor Level

22/11/2018: Earl Shilton Construction continues to progress quickly. The first floor joists are now in place a

Up To First Floor Level

22/10/2018: Earl Shilton Construction has progressed quickly. The block work is approaching first floor level

Engineering Blues

02/09/2018: Earl Shilton Our builders have reacted quickly to the green light to start development and laid al

Breaking Ground

31/08/2018: Earl Shilton Construction has finally started on the land been 30 – 32 Highfield Street in

What our clients say

I was tired of my savings being in the bank and not gaining the interest I wanted and actually losing money due to inflation being higher.

I decided to work in partnership with The Nova Crowd who showed me a safe and secure way of getting more for my money and I am now making my money work for me.

review image

Graham Lamb

Humberside, United Kingdom

Having done a development project in the past I know how stressful and time consuming it can be so it was better for me to work with the Nova Crowd to get the rewards without the stress.

review image

Nigel Perry

York, United Kingham