The Nova Crowd offer project management, project finance and portfolio development services.
Our skilled project management team are ready to deliver any development.
We finance projects that fit our criteria as well as help to define and implement a suitable financing approach for projects that we don’t finance ourselves.
The Nova Crowd will consider all opportunities on a without prejudice basis.
The Nova Crowd are always looking for opportunities to add value.
10/11/2020: Earl Shilton Eon have been to install our meters. Ready for when tenants move in. Finishing touche
07/11/2020: Earl Shilton Severn Trent Water have put the signs up to close the road so we can get water to the
04/11/2020: Barwell The top two floors now have their windows in. All measured up and ready for the ground flo
22/09/2020: Barwell Middle floor windows starting to go in and looking fantastic. The size of them really give
17/09/2020: Barwell Block work on the outside near completed so we can start to measure the windows and get th
28/08/2020: Earl Shilton We have taken the scaffolding down from the front of Earl Shilton ready for Western P
01/08/2020: Earl Shilton Kitchens fitted with the floors done ready for the second fixing once we get the elec
03/06/2020: Barwell Planning notice is up for phase 2 of our Barwell project for 14 new build apartments. Woul
07/07/2020: Earl Shilton The outside has now been painted. Really brightens up the exterior and gives it that
01/07/2020: Barwell Getting the site ready for the existing windows to be removed ready for the new ones to be
30/06/2020: Barwell Good view from the 2nd floor of the diggers getting rid of the mass of debris from the sit
21/06/2020: Earl Shilton No rest for the builders over the weekend fitting the kitchens in the 6 apartments. A
08/06/2020: Earl Shilton Plasterer finished the external rendering. Looks so much cleaner and now looks in kee
05/06/2020: Barwell Scaffolding fully up at Barwell now so we can prepare for the windows. Also makes it easie
04/06/2020: Barwell Thousands of blocks unloaded onto site ready to finish the internal walls. Once these are
27/05/2020: Barwell Diggers have arrived on site to get rid off the rubbish removed from the building. As it i
20/05/2020: Earl Shilton Internal doors and skirting boards now in place in the flats. All in place which now
13/05/2020: Earl Shilton Scaffolding is back up ready to do the rendering on the outside of the building. Fina
20/03/2020: Earl Shilton Painting completed in the flats, amazing how a white gloss can bring out the space. K
01/03/2020: Earl Shilton Final velux window fitted in the stairwell. Ready for the final bits of plastering be
21/02/2020: Barwell Trenches have been dug on the ground floor. All been signed off by the building inspector
10/02/2020: Barwell Time to block up the biggest hole in the building on the 3rd floor. The wind is blowing a
31/01/2020: Barwell The lads are working hard to lay the blocks. Ground floor up to ceiling height and service
21/01/2020: Barwell Glad to have had the winter break and get everything in order, back with a vengeance and s
26/09/2019: Barwell Cleaning up the car park where all the internally rubbish was pushed. Starting to move on
18/09/2019: Barwell Blocks have been delivered ready to start the internal walls. This will allow us to get th
12/09/2019: Barwell We are happy with our boards that have been delivered today. Shows the locals what we are
15/08/2019: Earl Shilton We have a watertight building as the windows and doors have now been fitted. Lath and
02/08/2019: Barwell Quite a lot of tonnes of rubbish now out of the building and we are ready to start work on
07/07/2019: Barwell What a difference 2 days makes. Really starting to feeling the sense of space once it has
05/07/2019: Barwell Planning permission has been granted to convert this office block into 15 apartments. 12 2
28/06/2019: Earl Shilton Windows have now taken shape and starting to look like the finished property. Looking
26/06/2019: Earl Shilton Roofers working hard to make the building water tight so we can start on the internal
25/05/2019: Earl Shilton Difficult winter with the weather so no builders on site. So glad to be back up and r
17/06/2019: Earl Shilton 3rd floor blocks being put down. Roof steels in place. Scaffold ready for 3rd lift as
19/12/18: Earl Shilton 3rd floor blocks being put down. More scaffolding required as we prepare for the roof j
22/11/2018: Earl Shilton Construction continues to progress quickly. The first floor joists are now in place a
22/10/2018: Earl Shilton Construction has progressed quickly. The block work is approaching first floor level
02/09/2018: Earl Shilton Our builders have reacted quickly to the green light to start development and laid al
31/08/2018: Earl Shilton Construction has finally started on the land been 30 – 32 Highfield Street in