More Details10/11/2020: Earl Shilton Eon have been to install our meters. Ready for when tenants move in. Finishing touche
07/11/2020: Earl Shilton Severn Trent Water have put the signs up to close the road so we can get water to the
04/11/2020: Barwell The top two floors now have their windows in. All measured up and ready for the ground flo
22/09/2020: Barwell Middle floor windows starting to go in and looking fantastic. The size of them really give
17/09/2020: Barwell Block work on the outside near completed so we can start to measure the windows and get th
28/08/2020: Earl Shilton We have taken the scaffolding down from the front of Earl Shilton ready for Western P
01/08/2020: Earl Shilton Kitchens fitted with the floors done ready for the second fixing once we get the elec
03/06/2020: Barwell Planning notice is up for phase 2 of our Barwell project for 14 new build apartments. Woul
07/07/2020: Earl Shilton The outside has now been painted. Really brightens up the exterior and gives it that
01/07/2020: Barwell Getting the site ready for the existing windows to be removed ready for the new ones to be
30/06/2020: Barwell Good view from the 2nd floor of the diggers getting rid of the mass of debris from the sit
21/06/2020: Earl Shilton No rest for the builders over the weekend fitting the kitchens in the 6 apartments. A
08/06/2020: Earl Shilton Plasterer finished the external rendering. Looks so much cleaner and now looks in kee
05/06/2020: Barwell Scaffolding fully up at Barwell now so we can prepare for the windows. Also makes it easie
04/06/2020: Barwell Thousands of blocks unloaded onto site ready to finish the internal walls. Once these are
27/05/2020: Barwell Diggers have arrived on site to get rid off the rubbish removed from the building. As it i
20/05/2020: Earl Shilton Internal doors and skirting boards now in place in the flats. All in place which now
13/05/2020: Earl Shilton Scaffolding is back up ready to do the rendering on the outside of the building. Fina
20/03/2020: Earl Shilton Painting completed in the flats, amazing how a white gloss can bring out the space. K
01/03/2020: Earl Shilton Final velux window fitted in the stairwell. Ready for the final bits of plastering be
21/02/2020: Barwell Trenches have been dug on the ground floor. All been signed off by the building inspector
10/02/2020: Barwell Time to block up the biggest hole in the building on the 3rd floor. The wind is blowing a
31/01/2020: Barwell The lads are working hard to lay the blocks. Ground floor up to ceiling height and service
21/01/2020: Barwell Glad to have had the winter break and get everything in order, back with a vengeance and s
26/09/2019: Barwell Cleaning up the car park where all the internally rubbish was pushed. Starting to move on
18/09/2019: Barwell Blocks have been delivered ready to start the internal walls. This will allow us to get th
12/09/2019: Barwell We are happy with our boards that have been delivered today. Shows the locals what we are
15/08/2019: Earl Shilton We have a watertight building as the windows and doors have now been fitted. Lath and
02/08/2019: Barwell Quite a lot of tonnes of rubbish now out of the building and we are ready to start work on
07/07/2019: Barwell What a difference 2 days makes. Really starting to feeling the sense of space once it has
05/07/2019: Barwell Planning permission has been granted to convert this office block into 15 apartments. 12 2
28/06/2019: Earl Shilton Windows have now taken shape and starting to look like the finished property. Looking
26/06/2019: Earl Shilton Roofers working hard to make the building water tight so we can start on the internal
25/05/2019: Earl Shilton Difficult winter with the weather so no builders on site. So glad to be back up and r
17/06/2019: Earl Shilton 3rd floor blocks being put down. Roof steels in place. Scaffold ready for 3rd lift as
19/12/18: Earl Shilton 3rd floor blocks being put down. More scaffolding required as we prepare for the roof j
22/11/2018: Earl Shilton Construction continues to progress quickly. The first floor joists are now in place a
22/10/2018: Earl Shilton Construction has progressed quickly. The block work is approaching first floor level
02/09/2018: Earl Shilton Our builders have reacted quickly to the green light to start development and laid al
31/08/2018: Earl Shilton Construction has finally started on the land been 30 – 32 Highfield Street in